In the current landscape of information technology, where network infrastructure forms the backbone of nearly every enterprise, the ability to accurately simulate and test network designs before deployment is not just an advantage—it’s a necessity. For professionals sourcing switches and routers, making an informed purchasing decision requires more than just reviewing spec sheets; it demands hands-on validation in an environment that mirrors real-world conditions. This is where the power of a robust network simulation platform becomes indispensable. GNS3 stands out as a premier tool, enabling engineers to construct, configure, and troubleshoot complex network topologies virtually. By integrating virtualized network operating systems like PicOS-V, GNS3 allows for a level of testing fidelity that was once only possible with expensive physical hardware. This article provides a detailed, step-by-step guide for network professionals to leverage these tools, specifically focusing on configuring a Multi-Chassis Link Aggregation Group (MLAG) setup—a critical feature for ensuring high availability and redundancy in modern network designs involving core switches.

SDWAN Topo 1.1

Downloading and Installing the Necessary Components

The first step involves acquiring the PicOS-V virtual machine image. This can be done by visiting telecomate.com. Once on the site, you can either locate the “Picos-V Virtual Operating System” directly from the homepage banner or use the search functionality. After finding the product page, initiating the download typically requires a simple registration and login process. With the image file secured, the next phase is setting up the GNS3 environment. Launch GNS3 and navigate to the preferences menu. Here, you will create a new QEMU virtual machine. The process involves specifying a name for the VM, selecting the appropriate QEMU binary, and allocating sufficient RAM—2048 MB is recommended for smooth operation. Setting the console type to ‘telnet’ is crucial for subsequent management. The final step in this stage is to import the previously downloaded PicOS-V disk image into the new VM configuration and assign it a recognizable symbol for easy identification within your project topology.

Importing a Debian Linux Server into the Simulation

A complete test environment often requires end-hosts to generate and receive traffic. The GNS3 marketplace offers a variety of pre-configured appliances, including Debian Linux servers. To import one, access the appliances page via the provided link within GNS3, search for “Debian,” and download the relevant version, such as debian-11.8.qcow2. Back in the GNS3 main interface, use the ‘Import appliance’ function under the ‘File’ menu. Select the downloaded Debian file and follow the prompts, choosing to install it on the main server. The import process will guide you through selecting the correct disk image file. Once completed, the Debian server will appear in your device list, ready to be deployed.

Constructing the MLAG Test Topology

A well-structured topology is the foundation of any meaningful network test. Start by creating a new GNS3 project. Within this project, drag and drop two instances of the PicOS-V switch and two instances of the Debian server from the devices panel. For the servers to connect to both switches, their network adapter count needs to be increased. Right-click on each Debian server, select ‘Configure,’ go to the ‘Network’ tab, and change the number of adapters to 2. This creates the additional interfaces needed for the MLAG bonds. Now, using the connection tool, link the devices: connect one network interface from each Debian server to the first PicOS-V switch, and the other interface to the second PicOS-V switch. This creates the physical cross-connect necessary for an MLAG configuration. Power on all devices and open a console session to each one to begin software configuration.

Configuring the Hosts and Network Switches

On each Debian server, log in using the default credentials. You will need to elevate your privileges to root using sudo su. Use the ip link showcommand to verify that the additional network interfaces (e.g., ens4, ens5) are present. If they are in a ‘DOWN’ state, bring them up with the ifconfig [interface_name] upcommand. The next step is to create a network bond interface, which will present the two physical links as a single logical link to the switches. Edit the network interfaces configuration file, typically /etc/network/interfaces, to define the bond0 interface with the appropriate settings (e.g., mode 4 for LACP). After saving the changes, restart the networking service to apply the new configuration. On the PicOS-V switches, log in and begin by enabling protocols like LLDP to aid in topology discovery. Then, proceed to create the aggregated Ethernet interfaces (ae1, ae2) that will correspond to the bond interfaces on the servers. The core of the MLAG configuration involves setting up the inter-switch link (ISL) and defining the MLAG domain parameters on both switches to ensure they can synchronize state information.

Validating and Testing the MLAG Functionality

A configuration is only successful if it works as intended under various conditions. Start with basic connectivity checks. From one Debian server, ping the IP address of the other server. This simple test verifies that the layer-2 network is functioning. On the PicOS-V switches, use commands like show mac-address-tableto confirm that the MAC addresses of the servers are being learned correctly across the MLAG ports. The true test of MLAG is its failover capability. To simulate a link failure, you can administratively shut down one of the physical ports connected from a server to one switch. During this process, continuous pinging from one server to the other should demonstrate only a minimal packet loss—perhaps one or two packets—before the traffic seamlessly transitions to the remaining active link. This validates that the network redundancy is working correctly. For a more rigorous test, you can simulate an entire switch failure by powering off one of the PicOS-V instances. Again, traffic should be restored quickly via the peer switch, proving the high-ailability design.

The strategic importance of thorough network testing cannot be overstated for anyone responsible for designing or maintaining critical infrastructure. Utilizing GNS3 in conjunction with PicOS-V provides a powerful, cost-effective platform to validate complex network behaviors like MLAG before a single physical switch is installed. This hands-on approach mitigates risk, reduces costly configuration errors during deployment, and builds deep operational confidence. By following the steps outlined above, network engineers can effectively simulate a resilient multi-switch environment, proving that link and device redundancy mechanisms perform as expected. This methodology empowers professionals to make more informed decisions when selecting and deploying switches and routers from telecomate.com, ensuring that the chosen hardware and software configurations will deliver the required performance and reliability in the live production network.